Sliding patio door installation – Precision, performance, and premium finish

At JackStone Inc., we specialize in high-end remodeling services across the U.S. market – and when it comes to complex installs, we never back down. One of our recent projects involved the installation of an oversized custom-built sliding patio door, a job requiring serious coordination, experience, and craftsmanship.

Step-by-Step: Our installation process

The process began with a full verification of door specs upon delivery. Before any demolition, we protected all interior surfaces – floors, thresholds, and nearby finishes – using drop cloths and protective film.

We disconnected alarms and wiring, carefully removed the existing door and frame, and inspected the rough opening for moisture and damage. After cleanup and leveling, we waterproofed the sill and header with flashing tape and prepared for installation using laser levels and premium-grade shims.

Once the new unit was in place, we secured it using heavy-duty fasteners, sealed all sides with low-expansion foam, and finished with silicone and exterior-grade weatherproofing.

Key features of this project

• Low-E insulated glass for energy efficiency and sound reduction.

• Multi-point locking system for enhanced security.

• Smooth-glide operation due to perfect leveling and roller adjustment.

• Custom sill height alignment to match a ¾” hardwood interior floor.


Installation Challenges & Smart Solutions

• The door was oversized and heavy – requiring several installers and temporary bracing.

• The framing was slightly out of square – corrected using shims and micro-adjustments.

• Tight clearance called for precision trim work and expert-level alignment.


The Result

Despite the oversized format, the entire job was completed in just one day. The client praised the performance, look, and smooth functionality of the new sliding door – and we couldn’t agree more.

At JackStone Inc., we bring expert craftsmanship, high-end materials, and a “no excuses” attitude to every project. Whether it takes two hands or six men – and sometimes even a crane – we get it done.

Looking to upgrade your doors or start a bigger remodel? Let’s make it happen together.


Decorative wall upgrade with lighting and USB – Custom interior work by JackStone Inc.

At JackStone Inc., we take pride in combining aesthetics, function, and precision in every detail. Our recent decorative wall installation with built-in lighting and USB outlets showcases exactly how modern upgrades can elevate everyday living – even in occupied, residential spaces.

Project scope – Step-by-Step

This project involved a full transformation of a bedroom accent wall with integrated electrical work, custom millwork, and precision painting.

Here’s what we delivered:

  • Protected all work areas with drop cloths and full plastic masking for spray painting.
  • Opened the wall to install new electrical wiring for two USB outlets and two directional sconces.
  • Added switch boxes conveniently accessible from bedside.
  • Built vertical and horizontal furring strips to support the wall design.
  • Closed cavities with drywall, joint compound, sanding, and spot priming.
  • Laser-measured and marked the entire wall layout.
  • Installed trim and battens per layout, sealed all seams with acrylic caulk.
  • Painted the wall using professional techniques suited to the finish selected.
  • Mounted lighting, tested electrical connections, and finalized all cleanup.

Challenges in custom installations

Even in small-scale renovations, precision is everything:

  • Wall openings required care to avoid damage to existing finishes.
  • Uneven surfaces meant layout alignment had to be laser-checked.
  • Spray painting indoors required full masking and air control.
  • Studs didn’t align with the trim layout – custom blocking was necessary.
  • Hidden piping or electrical lines required wall scanning before driving nails.
  • Seasonal humidity can cause wood to shrink or crack if not accounted for.

✔️ Our Solutions

  • Used laser levels and angle squares to guarantee symmetry.
  • Applied both adhesive and nails for secure trim installation.
  • Divided work into clean, safe phases for occupied-room execution.
  • Educated the client on humidity control for long-term durability.

Why It Matters

This kind of custom wall work isn’t just visual – it brings lasting comfort and smart functionality. USB access, reading lights, smooth finishes – all tailored to our client’s needs.

Looking for interior remodeling or custom millwork in the Chicago area?
Contact JackStone Inc. – precision is our standard.

📍 Serving: Chicago, Wilmette, Northbrook, Highland Park, Lake Zurich, Deer Park, Barrington, Inverness, Winnetka


Bathroom renovation in a high-rise building – Project summary by JackStone Inc.

Renovating a bathroom in a high-rise apartment comes with a unique set of challenges – and at JackStone Inc., we specialize in delivering high-end results even in the most complex conditions. Our recent full-scope bathroom remodel in a Chicago high-rise is the perfect example of precision planning, expert execution, and clean craftsmanship.

Scope of work – step by step

  • Protecting all access areas from elevator to unit (floor protection, wall wrap, artwork removal).
  • Full demolition down to metal studs while protecting the existing bathtub (per client request).
  • Framing, leveling, and structural prep for plumbing and electric installations.
  • Installing Durock cement boards and waterproof drywall.
  • Waterproofing with RedGard and priming surfaces.
  • Custom tile installation and professional grouting.
  • Installing ceiling, LED lighting, and ventilation.
  • Mounting toilet, vanity, fixtures, and accessories.
  • Glass panels, trim, painting, and final detailing.
  • Deep clean and final walkthrough with client.

Common high-rise challenges

  • No dedicated water shut-off for the unit – required full riser shutdown.
  • Walls not aligned at perfect 90° angles – needed laser corrections.
  • Metal stud walls required structural reinforcements.
  • Tight wall depth with overlapping plumbing, electrical, and sprinkler systems.
  • Operating in an active residential building with strict noise and cleanliness standards.

Our solutions

  • Coordinated riser shutdown and added unit-specific shut-off valves.
  • Laser-leveled all surfaces and corners.
  • Reinforced cavities with fire-rated lumber or high-density board.
  • Custom routing of all MEP systems to comply with code.
  • Pressure-tested and taped plumbing layout before closing the walls.

Key highlights

  • Full bathroom remodel completed in under 3 weeks.
  • Oversized tub replaced with a 5-foot standard, allowing for a custom towel niche.
  • All valves inside walls clearly labeled and wrapped for future access.
  • Every detail double-checked for precision and longevity.

Looking for a trusted general contractor in the Chicago area who understands how to handle high-rise renovations? Contact JackStone Inc. today for your next bathroom remodel or full apartment renovation.

📍 Serving: Chicago, Highland Park, Wilmette, Northbrook, Deer Park, Barrington, Lake Zurich, Inverness, and Winnetka.